Analýza prevádzky paroplynového cyklu v sústave centralizovaného zásobovania teplom
Saved in:
| Main Author: | |
|---|---|
| Other Authors: | |
| Format: | Manuscript Book |
| Language: | Slovak |
| Published: |
Bratislava :
STU v Bratislave SjF,
2012
|
| Subjects: | |
| Online Access: | VAIS |
| Tags: |
No Tags, Be the first to tag this record!
|
MARC
| LEADER | 00000ntm a22000003a 4500 | ||
|---|---|---|---|
| 001 | stu263702 | ||
| 005 | 20150617230220.0 | ||
| 008 | 130312s2012----xo------------------slo-d | ||
| 040 | |a STU |b slo | ||
| 041 | 0 | |a slo | |
| 044 | |a xo | ||
| 100 | 1 | |a Šidlo, Peter, |d 1988- |4 aut |u J |T SjF Strojnícka fakulta |X 50303 |U J |Y 20 |7 A000050303 | |
| 242 | 0 | 0 | |a Analysis of combined turbine cycle process in a central heating grid system. |y eng |
| 245 | 1 | |a Analýza prevádzky paroplynového cyklu v sústave centralizovaného zásobovania teplom | |
| 260 | |a Bratislava : |b STU v Bratislave SjF, |c 2012 | ||
| 650 | 7 | |a tepelné energetické stroje a zariadenia |2 stusub | |
| 650 | 7 | |a Thermal Power Engineering |2 estusub | |
| 650 | 7 | |a gas turbine |2 estusub | |
| 650 | 7 | |a spaľovacia turbína |2 stusub | |
| 700 | 1 | |a Urban, František, |d 1952- |4 ths |u J0060 |U SjF Strojnícka fakulta |T SjF Ústav tepelnej energetiky |X 2435 |U J0060 |Y 805 |7 A000002435 | |
| 856 | 4 | |a info a plný text |u http://is.stuba.sk/zp/portal_zp.pl?podrobnosti=85477 |3 VAIS | |
| 996 | |b 284J043131 |c J*1614/DP |l JJSK |s A |a 24 |w stu263702_0001 | ||