Návrh opatrení pre zníženie času pretypovávania v podniku Secop s.r.o. pomocou metódy SMED
Salvato in:
| Autore principale: | |
|---|---|
| Altri autori: | |
| Natura: | Manoscritto Libro |
| Lingua: | slovacco |
| Pubblicazione: |
2015
|
| Soggetti: | |
| Accesso online: | http://is.stuba.sk/zp/portal_zp.pl?podrobnosti=121270 |
| Tags: |
Nessun Tag, puoi essere il primo ad aggiungerne!!
|
MARC
| LEADER | 00000ntm a22000003a 4500 | ||
|---|---|---|---|
| 001 | stuzp50175 | ||
| 003 | SK-STU | ||
| 005 | 20160719153459.1 | ||
| 007 | ta | ||
| 008 | 150427s2015----xo-----f-mn---000-0-slo-d | ||
| 040 | |a STU |b slo | ||
| 041 | 0 | |a slo | |
| 100 | 1 | |a Karaba, Róbert |u 064000 |4 aut |U MTF Materiálovotechnologická fakulta |T MTF Ústav priemyselného inžinierstva a manažmentu |X 45704 |U M4000 |Y 84 |7 45704 | |
| 242 | 0 | 1 | |a Proposal of measures for reducing the setup time in the company Secop Ltd. using the method SMED |y eng |
| 245 | 1 | 0 | |a Návrh opatrení pre zníženie času pretypovávania v podniku Secop s.r.o. pomocou metódy SMED |
| 260 | |c 2015 | ||
| 650 | 4 | |a lean manažment |2 slo | |
| 650 | 4 | |a SMED |2 slo | |
| 650 | 4 | |a štíhla výroba |2 slo | |
| 650 | 4 | |a pretypovávanie |2 slo | |
| 650 | 4 | |a zmena modelu |2 slo | |
| 650 | 4 | |a zefektívnenie procesu |2 slo | |
| 650 | 4 | |a lean management |2 eng | |
| 650 | 4 | |a setup time |2 eng | |
| 650 | 4 | |a lean production |2 eng | |
| 650 | 4 | |a model change |2 eng | |
| 650 | 4 | |a SMED |2 eng | |
| 650 | 4 | |a streamlining process |2 eng | |
| 700 | 1 | |a Beluský, Martin |4 ths |X 36930 |7 A000036930 | |
| 856 | 4 | |u http://is.stuba.sk/zp/portal_zp.pl?podrobnosti=121270 | |
| 996 | |c M* BP-7259 |l MMSKP |s P |a 0 |w stuzp50175_0001 | ||
| SQL | |a stuzp50175 |b DBP |c SLO |d Návrh opatrení pre zníženie času pretypovávania v podniku Secop s.r.o. pomocou metódy SMED |e 45704 |f Karaba, Róbert |g 064000 |h 36930 |i Beluský, Martin |j 20150625 |k 175 |l 06 |m http://is.stuba.sk/zp/portal_zp.pl?podrobnosti=121270 |n B-PMA |o 5.2.52. priemyselné inžinierstvo | ||