Stavebno-technologický projekt: Bytový dom TUJETOIN, etapa 2
Saved in:
| Main Author: | |
|---|---|
| Other Authors: | |
| Format: | Manuscript Book |
| Language: | Slovak |
| Published: |
2018
|
| Subjects: | |
| Online Access: | http://is.stuba.sk/zp/portal_zp.pl?podrobnosti=139258 https://opac.crzp.sk/?fn=detailBiblioForm&sid=7748F8ABF7A423EAE677DC3BD0B0 |
| Tags: |
No Tags, Be the first to tag this record!
|
MARC
| LEADER | 00000ntm a22000003a 4500 | ||
|---|---|---|---|
| 001 | stuzp69144 | ||
| 003 | SK-STU | ||
| 005 | 20230628123310.5 | ||
| 007 | ta | ||
| 008 | 150427s2015----xo-----f-mn---000-0-slo-d | ||
| 040 | |a STU |b slo | ||
| 041 | 0 | |a slo | |
| 100 | 1 | |a Pastírik, Denis |u 010270 |4 aut |U SvF Stavebná fakulta |T SvF Katedra technológie stavieb |X 54592 |U V270 |Y 28 |7 54592 | |
| 242 | 0 | 1 | |a Construction - Technological Project: TUJETOIN Polyfunctional Apartment Building, part 2 |y eng |
| 245 | 1 | 0 | |a Stavebno-technologický projekt: Bytový dom TUJETOIN, etapa 2 |
| 260 | |c 2018 | ||
| 650 | 4 | |a realizačný projekt |2 slo | |
| 650 | 4 | |a zariadenie staveniska |2 slo | |
| 650 | 4 | |a časový plán |2 slo | |
| 650 | 4 | |a technologické pravidlo |2 slo | |
| 650 | 4 | |a pilóty |2 slo | |
| 650 | 4 | |a building site |2 eng | |
| 650 | 4 | |a schedule |2 eng | |
| 650 | 4 | |a technological rule |2 eng | |
| 650 | 4 | |a implementation project |2 eng | |
| 650 | 4 | |a bored piles |2 eng | |
| 700 | 1 | |a Ďubek, Marek |u 010270 |k Z1 |4 ths |U SvF Stavebná fakulta |T SvF Katedra technológie stavieb |X 20818 |U V270 |Y 28 |7 A000020818 | |
| 856 | 4 | |u http://is.stuba.sk/zp/portal_zp.pl?podrobnosti=139258 | |
| 856 | 4 | |u https://opac.crzp.sk/?fn=detailBiblioForm&sid=7748F8ABF7A423EAE677DC3BD0B0 | |